Skip to main content
Cost Updating
Updated over a year ago

If the cost statistics recorded by the tracker differ from the cost statistics on the source side, change the cost amount using the Update Cost functionality.

1. Select the campaign whose costs you want to update.

2. Click the Update cost button.

A pop-up window will appear:

3. Specify the time period to which the cost change will apply.

! The time period cannot exceed 31 days.

4. Specify the time zone of the time period.

! The specified time zone must match the time zone selected in the settings on the side of the traffic source.

5. Specify the cost value to which you want to replace the value recorded by the tracker.

6. Apply the changes.

Changes are applied in the background.

The limit for applying cost updates for a single campaign is 3 tasks per hour.

Did this answer your question?